An internship in ropeway design: three construction sites, no two alike

I have now been part of the Salzmann Ingenieure team for more than two months. I was fully involved from the very start: after a short introduction to the software and the workflows, I was already making real contributions in my first week – with no theoretical practice projects at all.

Intern Leon Mark wearing a hard hat on the ropeway construction site

The tasks I have taken on since then are extremely varied. They range from the first preliminary considerations in the preliminary design of ropeways, through drawing plans for the building application, to producing and optimising detailed design drawings. Preparing tender documents was also on the programme, so I have already gained a deep insight into all of these areas.

It is incredibly rewarding to see that you really can contribute to a project's progress, and whenever I get stuck, every colleague in the team takes the time to help me with my questions.

From the drawing board straight into practice

Over the past few weeks I visited three of our ropeway construction sites that are currently in the construction phase. That was especially exciting. You see at first hand what you design at your desk. It helps enormously in picturing the details back in the office.

These three installations are hugely interesting to me because no two of them are alike. The carrier sizes alone reflect that range: the chairlifts use 4-seater, 6-seater and 8-seater chairs. On the manufacturer side, both industry leaders are represented, Doppelmayr and Leitner. The mix of projects is exciting too: these are not only new builds – a second-hand installation is also getting a second life at a new location.

The station buildings of all three projects are completely different as well. They range from open stations and stations enclosed against the wind to a top station with an adjoining restaurant. The construction methods used are just as varied and include reinforced concrete as well as steel and timber construction. And since each project is in a different Austrian province, there is no geographical monotony either.

Construction site of the bottom station of the Freda Bahn with the station truss, as of September 2026
Freda Bahn – bottom station, as of 30 September 2026
Construction site of the Rosenkranz bottom station with its round steel structure, as of October 2026
Rosenkranz – bottom station, as of 8 October 2026
Construction site of the Schartenkogel bottom station with a crane and timber elements, as of October 2026
Schartenkogel – bottom station, as of 14 October 2026

It is exactly this variety that I value so much about my internship in ropeway design. My interim report is therefore thoroughly positive, and I am very curious to see what the coming months have in store for me.

‍

Text and photos: Leon Mark, intern at Salzmann Ingenieure

Fancy a career in ropeway design?

Do you want to help shape real projects from day one, like Leon – in the office and on site? Whether you are looking for an internship, your first job or a move with experience as a civil engineer or architect: we look forward to your application!

Here are our current vacancies – speculative applications are always welcome too.

Latest news

All news
News
13 November 2026
The excavators move in: a new 4-seater chairlift for the Wurbauerkogel
News
13 November 2026
The excavators move in: a new 4-seater chairlift for the Wurbauerkogel
Excavator demolishing the old bottom station at the Wurbauerkogel in Windischgarsten
News
30 October 2026
Permit submission documents finished – and done together!
News
30 October 2026
Permit submission documents finished – and done together!
The Salzmann Ingenieure team sorting and stamping the permit submission documents for the Garfrescha chairlift
News
16 October 2026
Schartenkogel-Express: Austria’s first “Ropera” is taking shape on the Glungezer
News
16 October 2026
Schartenkogel-Express: Austria’s first “Ropera” is taking shape on the Glungezer
Aerial view of the line of the new 6-seater chairlift Schartenkogel-Express in the Glungezer ski area near Tulfes
News
9 October 2026
Ten years at Salzmann: congratulations, Katrin!
News
9 October 2026
Ten years at Salzmann: congratulations, Katrin!
Katrin Mangeng celebrates 10 years at Salzmann Ingenieure
News
14 September 2026
One of Austria’s highest-capacity chairlifts is taking shape on the Kreischberg
News
14 September 2026
One of Austria’s highest-capacity chairlifts is taking shape on the Kreischberg
Construction site of the bottom station of the new 8-seater chairlift at the Kreischberg with a tower crane and the station frame already delivered
News
4 September 2026
Old made new: the Freda Bahn
News
4 September 2026
Old made new: the Freda Bahn
Top station of the old 2CLF Fredakopf installation in the Montafon with the Fredakopf summit in the background
News
27 August 2026
New website online
News
27 August 2026
New website online
Kaiblinggratbahn, top station
News
27 August 2026
Welcome to the team, Sani
News
27 August 2026
Welcome to the team, Sani
Sani, project and office assistant at Salzmann Ingenieure
News
27 August 2026
Welcome to the team, Leon
News
27 August 2026
Welcome to the team, Leon
Leon, intern at Salzmann Ingenieure