8EUB Kreuzjoch Panoramabahn

The Panoramabahn is a new highlight of our ski area

The Panoramabahn as a new highlight of the ski area

In the 2014/15 winter season the Panoramabahn set off on its first ride in the Silvretta Montafon ski area. The gondola lift with 76 carriers transports up to 2,360 winter sports enthusiasts to the top station at an altitude of 2,375 metres. The construction of the lift is a further measure in the link-up of the Montafoner Hochjoch and Silvretta Nova ski areas in 2011. The Panoramabahn is intended to improve movement between the two ski areas. After the first year of operation, the client and board member of Silvretta Montafon Bergbahnen AG, Peter Marko, is delighted: “Utilisation and feedback are outstanding.”

Since the 2011 winter season the Grasjoch and Hochalpila 8-passenger gondola lifts, likewise designed by Salzmann Ingenieure, have connected the two Vorarlberg ski areas of Montafon Hochjoch and Silvretta Nova. With more than 140 kilometres of pistes, the combined Silvretta Montafon is one of the largest and most attractive ski areas in western Austria. “Even then an overall concept was drawn up which provided for the chairlifts to be replaced at a later date by a comfortable lift that would increase the appeal of the ski area still further and encourage movement between the areas,” explains the Managing Director of Salzmann Ingenieure, Stephan Salzmann.

Until then the connection to the Grasjoch link lift was comparatively laborious and time-consuming for winter sports enthusiasts travelling in the Hochjoch ski area. Visitors had to use ageing double chairlifts to reach the link lift's top station at the Grasjoch. “From the Kapell, the centre of the Hochjoch, skiers needed almost forty minutes to get to the Grasjoch,” explains Salzmann. “That is why some visitors hesitated to move from the Silvretta Nova towards the Hochjoch.”

‍

Technical data

System type

Monocable gondola lift with 8-passenger cabins

‍

Drive

Top station

‍

Tensioning

Bottom station

‍

Bottom station elevation

1,744.01 m a.s.l.

‍

Top station elevation

2,375.01 m a.s.l

‍

Vertical rise

631 m

‍

Horizontal line length

2,208.6 m

‍

Capacity

2,345 persons/hour

‍

Number of carriers

76

‍

Number of towers

12

‍

Line speed

6 m/sec

‍

Drive power in operation

632 kW

‍

Drive power on start-up

799 kW

‍

Investment volume

EUR 12.5 million

‍

Construction period

June - November

‍

Project
8EUB Panoramabahn
Completion
2014
In collaboration with
Silvretta Montafon Bergbahnen AG
Newsletter PDF
Download

2012: the design phase begins

Together with Roman Sandrell and Martin Oberhammer, those responsible for planning at Silvretta Montafon Bergbahnen AG, the Bregenz engineers began the preliminary design in 2012. At the outset an option running below the mountain ridge was discussed with the client in order to be as sheltered from the wind as possible. We proposed, however, examining a further alignment running directly along the mountain ridge. The advantage of this option is a top station location which on the one hand gives winter sports enthusiasts optimum piste access on both sides and on the other offers a sensational overview of the surroundings and the lifts on offer.” In addition, this alignment opens up a beautiful panorama for visitors during the ride.

Elaborate wind measurement

In order to be able to check whether this more exposed option above the mountain ridge is more strongly affected by wind, an elaborate wind measurement programme was carried out during the 2012/13 winter season. The evaluation of the data showed that the wind-related standstill times of the two routes do not differ significantly from one another.

Gondola lift from the Floriade adapted

The optimum capacity of 2,345 persons per hour emerged from the analysis of skier flows and piste areas. High comfort and safety were further requirements for the lift. “We were very fortunate that the gondola lift which Silvretta Montafon had used at a garden show in the Netherlands met the requirements well,” explains Salzmann. From April to October 2012 the lift carried visitors through the site at the international garden show in the Netherlands. Some adaptations to the technology and the station buildings had to be made: the previous drive power and the haul rope were not sufficient, for example, as the lift had so far only run on flat routes. The line equipment also had to be adapted to the shape of the terrain. Transporting the 48-tonne haul rope to an altitude of 1,950 m was a particular challenge.

‍

Ground-breaking in June 2014

Following a nature conservation permit and the ropeway permit procedure, the ground-breaking took place in June 2014. The construction team erected the station buildings with the support of the Vorarlberg architecture office Lang-Vonier. In the course of construction the pistes in the descent area of the new Panoramabahn were improved. Steeper sections were eased, for example, in order to make the area even more family-friendly. A newly built full snowmaking system now ensures the best snow conditions at all times. Because of the synergies in the civil engineering works, Salzmann Ingenieure also took on part of the tendering and construction management in this area.

Short construction period

Despite partly poor weather conditions, the Panoramabahn entered service after only five months of construction, in time for the 2014/15 winter season. It became clear in the very first season that the lift's wind-related standstill times are very low. “Utilisation and feedback are outstanding,” explains the Managing Director of Silvretta Bergbahnen, Peter Marko. “With the construction of the Panoramabahn we have once again increased the appeal of the Silvretta Montafon ski area and significantly simplified the connection to the Grasjoch link lift.”

‍

Services provided in this project

All tourism services

Preliminary design

Permit planning

Detailed design

Tendering

Construction supervision

No items found.

Our projects

All projects