6SB Jöchle Bahn
The subject of cost efficiency

The art of investing in the right place
Guests’ expectations of comfort and quality are rising, and the investments in ropeways and snowmaking are enormous. Where are savings possible, and how can tight budgets be used efficiently? At the Glungezerbahn south-east of Innsbruck, Salzmann Ingenieure managed the balancing act. At the Jöchle-Bahn in the Silvretta Montafon ski area, a clever move made corresponding savings possible. Two examples of targeted investment.
JÖCHLE BAHN
New life for an old installation
An entirely different project, an entirely different client, entirely different measures – and yet the same principle: for the renewal of the Jöchle-Bahn in the Silvretta Montafon ski area, too, “fit for purpose” is the apt description. The large Vorarlberg ski area with 35 lifts came into being in 2010 from a merger of Silvretta Nova and Hochjoch.
One open point was the renewal of the old Jöchle double surface lift. Despite attractive pistes in a heavily used part of the ski area, fewer and fewer skiers were using it – a chairlift was needed. When the manufacturer Doppelmayr offered the 16-year-old Natrun combined lift from Maria Alm, the Montafon operators took it up.
Strict rules stretched to the limit
“Strict rules apply to the re-erection of an existing installation; nothing substantial may be changed,” Stephan Salzmann knows. The experienced ropeway planner made the most of the possibilities: the combined lift became a detachable 6-seater chairlift, and the top and bottom stations were swapped. The rope tension forces changed as well. The authorities accepted all of this.
On one point, however, the continued use of the installation nearly failed: at the new top station there was no room for a safety run-out, which was still prescribed in the original approval of 2002. The ropeway manufacturer Doppelmayr finally found a precedent in which the authority had already dispensed with a safety run-out. The project was saved.
System type
detachable 6-seater chairlift
Capacity
2,335 persons/h
Horizontal length
864 metres
Vertical rise
305 metres
Line length
963 metres
Ride time
3:30 minutes
Number of carriers
46
Number of towers
10
Max. line speed
5 m/s
Electrical power, operation
326 kW
Electrical power, start-up
412 kW
Manufacturer
Doppelmayr



Considerable design effort
“The design effort really is significantly greater with a used installation,” sums up Markus Vollmann, civil engineering project manager at Silvretta Montafon. Set against this is a corresponding cost saving.
The construction was then carried out under enormous time pressure: the Natrun combined lift was still running in summer operation in Maria Alm until mid-August 2018. After dismantling, many parts first had to be sent for inspection before they could be installed again in the Montafon. Even so, the new Jöchle-Bahn went into operation punctually for the 2018/19 winter season. Station frames, station equipment, drive, brakes and tensioning, the chairs and many tower components could be reused.
The used installation lacks some comfort features such as the weather protection bubble, Markus Vollmann concedes. “But they are not absolutely necessary on this slope, which is mainly skied in fine weather. The installation fully serves its purpose.”

Managing Director Salzmann Ingenieure
Setting priorities
Ropeway planner Salzmann considers it “entirely sensible” that a premium ski area should accept such a compromise: “The region still has a whole series of large, important investments ahead of it. Even in a financially strong area you have to set priorities.”
And here the circle closes between the large ski resort of Silvretta Montafon and the small niche operator on the Glungezer: the money available is always limited. The question is: how do I use it best? Where does the guest notice it most?
Salzmann sees the greatest leverage not in the individual project but in the planning for the whole area: “With a carefully worked-out concept I know exactly which investment brings the most benefit and in what order to implement the improvements.”