6SB Waldkopf

Ski paradise Sudelfeld - Waldkopfbahn

Waldkopfbahn: the starting signal for more quality and comfort

‍

With the construction of the new Waldkopfbahn in 2014, the modernisation drive of the Bavarian ski area Sudelfeld began after ten years of preparation. The 6-seat chairlift with a large service centre in the valley is the first step of a comprehensive concept for which Salzmann Ingenieure drew up a far-sighted master plan in 2005.

In 2005 the Bregenz-based planning office Salzmann Ingenieure was commissioned to survey the existing situation and to draw up a master plan for the Sudelfeld ski area. “It quickly became clear that, compared with other destinations, the ski area offers thoroughly interesting development opportunities. It emerged just as quickly that there was a great deal of ground to make up in terms of infrastructure and comfort,” reports Managing Director Stephan Salzmann.

‍

Good arguments for investment

Many small and in some cases outdated surface lifts were in use and no longer met winter sports enthusiasts' expectations of comfort. Almost every lift was operated by a different owner. The operators even took care of snowmaking individually. The storage capacities for it were altogether too small. The steep double surface lift on the Waldkopf slope made getting into the ski area a challenge for families and beginners.

The disadvantages in infrastructure and organisation were, however, offset by numerous positive arguments for investing in the Sudelfeld ski area: in terms of area it is one of the largest ski areas in Germany. The expansive, largely treeless alpine meadows are ideally suited to families and beginners. There are also some more demanding pistes for ambitious skiers. The transport links via the Bayerische Oberlandbahn are very good for guests from München, only 80 kilometres away. Around 2,500 free parking spaces at the bottom station of the Waldkopfbahn and a ski bus connection from Bayrischzell station are available.

Technical data

System type

detachable 6-seat chairlift

‍

Drive and tensioning

Bottom station

‍

Haul rope

Stranded spiral rope with 45 mm diameter

‍

Bottom station elevation

1,029 m

‍

Top station elevation

1,254 m

‍

Slope length 710 m

‍

Number of towers

7

‍

Number of chairs

41

‍

Line speed

5 m/s

‍

Ride time

approx. 3 min

‍

Capacity

2,800 p/h

‍

Construction period

4 months

Project
6SB Waldkopfbahn
Completion
2014
In collaboration with
Bergbahnen Sudelfeld GmbH & Co. KG
Newsletter PDF
Download
A master plan with staying power

“On the basis of our analysis we developed a master plan with five ropeway installations as early as 2005,” explains Stephan Salzmann. Because of the complicated ownership structure and the lengthy permit procedures for the snowmaking system, implementation was enormously delayed. “The cooperation with the people responsible endured over the years despite difficult framework conditions. In 2008 we adapted the master plan taking the current developments into account. The measures proposed remained the same, but in a different order,” says the Managing Director.

With the founding of Bergbahnen Sudelfeld GmbH under the leadership of the present Managing Director Egid Stadler, the project gained new momentum. Financing was secured through the Bavarian ropeway funding programme and the involvement of investor Anton Pletzer (Managing Director of Bergbahnen Hohe Salve GmbH, Hopfgarten). At the same time as the snowmaking system including the storage pond was realised, ropeway modernisation began in 2014 with the construction of the Waldkopfbahn.

‍

A comfortable way into the ski area

The detachable 6-seat chairlift on the Waldkopf slope entered service as early as the 2014/2015 season. It replaces an old double surface lift and makes it possible to enter the ski area without long waiting times. The lift is equipped with seat heating, weather protection bubbles and child safety devices. The bottom station is laid out as a generous infrastructure building: the service centre offers winter sports guests a modern ticket area, toilet facilities, a ski school, ski rental and ski storage as well as a shop. Storage rooms, offices, a garage for the piste machines and the rooms for the technical plant also have their place in the bottom station. “With up to 15,000 rides per day, the Waldkopfbahn is very well received,” says a delighted Salzmann.

‍

“What is really striking is that the measures proposed by Stephan Salzmann in the 2005 master plan were so apt and so sustainably right. There were many other ideas in the meantime, but in the end we came back to the first proposal and are now implementing it step by step.”
Portrait of Egid Stadler
Egid Stadler

Managing Director Bergbahnen Sudelfeld GmbH & Co. KG

Further investment fixed for 2016

All further measures are now being implemented step by step: the construction of the Sudelkopfbahn is planned for 2016. “As a strong repeat-ride lift, the high-capacity detachable chairlift will open up many fine descents. In my opinion it has the potential to become the main attraction in the area,” says Salzmann, looking to the future, and adds: “There are now also spectacular ideas for a feeder lift from Bayrischzell.”

Services provided in this project

All tourism services

Master plan for ski areas

Preliminary design

Permit planning

Detailed design

Tendering

Construction supervision